Welcome to the official website of Sichuan Julong Steel Structure Construction Engineering Co., Ltd

【Contact Us】   【CH】   【EN】

Engineering cases

Based on quality  Honor and promise   Striving for excellence

Engineering cases

Your current position:Home > English > Case > Steel structure workshop > Chengdu Dasheng e-commerce logistics center > Detailed information  
Chengdu Dasheng e-commerce logistics center

Project Name: steel structure project of unloading platform of Chengdu Dasheng e-commerce logistics distribution center

Project address: China (Sichuan) pilot Free Trade Zone, xihanggang street, Shuangliu County, Chengdu, Sichuan

Total project price: 18480000 yuan (in words: eighteen million four hundred and eighty thousand yuan only)

 

Project content:

Main steel structure, box column, support system, floor bearing plate, side formwork and sealing plate, shear nail, gutter, downpipe, high-strength bolt, shot blasting, stair ramp material production, installation and transportation (for specific steel structure construction and installation content, please talk with the professional person in ch rge, Tel: 13608177926 028-86799962).

 

Advantages of truss:

1. The advantage of truss is that the members mainly bear tension or pressure, which can give full play to the role of materials, save materials and reduce the weight of the structure. Commonly used are steel truss, reinforced concrete truss, prestressed concrete truss, wood truss, steel and wood composite truss, steel and concrete composite truss.

2. After being processed in the processing plant and safely transported to the construction site, the lifting equipment is ready, and the experts from the Academy of architecture and technology and the technical department of our company jointly review a group of classic lifting technical scheme of 30-40 tons of main girder Use high altitude mechanical equipment to lift giant column (one steel column weighs 15 tons)

3. Truss beam: it is a member that mainly bears tension or pressure, which can give full play to the role of materials, save materials and reduce the weight of the structure.

 

Project quality:

Meet the requirements of design, current construction and acceptance specifications and the quality and technical standards in the employer's documents. Quality grade: qualified

 

Safety production and prevention first

During the construction, Party B shall organize the construction in strict accordance with the safety production regulations, rules, regulations and relevant requirements, and shall be exclusively responsible.